|
Product Detail :
|
Discontinuing the Lift for cellar floor (reduction of lift operation for cellar floor) of the existing Schindler lifts of 11 stops (Cellar Stilt 9) and refixing and installation of lifts in operational for 10 stops (Stilt +9 floors) with necessary civil works and taking up comprehensive O and M for 3 months for the schindler lifts (82 Nos) installed at 2BHK Housing colony Ahmedguda Keesara Mandal Medchal Malkajgiri District.
|