|
Product Detail :
|
Discontinuing the Lift for cellar floor (reduction of lift operation for cellar floor) of the existing Schindler lifts of 11 stops (Cellar+Stilt+9) and refixing and installation of lifts in operational for 10 stops (Stilt +9 floors) with necessary civil works and taking up comprehensive O and M for 3 months for the schindler lifts (82 Nos) installed at 2BHK Housing colony Ahmedguda Keesara Mandal Medchal Malkajgiri District
|