Product Detail :
|
Ukai irrigation Project Manufacturing, Fabrication, Supply with Testing Work 1 set (10 Nos Tiers) Stop log Gate for Main Spill way Radial Gate And Shifting of old 1 set (10 Nos Tiers) Stop log Gate Dam site to Dam Store including cost of gas cutting, welding, labours, materials, tools, tackles, scaffolding, transportations, Painting etc as per standard drawing and specification and Actual site situation and Instruction of Engineer In charge for Radial Gate Size 51 x 48.5 at Ukai Dam Reservoir Project, District -Tapi.
|