Product Detail :
|
Erection and dismantling of sky climbers inside the Boiler, water washing of water wall tubes by High Pressure jet pump and carrying out D-meter survey in the areas like water circulation system and steam circulation system of Stage-IV/Unit-7/ Dr.NTTPS Boiler during the annual overhaul period 2025-26
|