|
Product Detail :
|
Electrical work in connection with [1] JP Div -Provision of 02 Escalators (up & down)
on each platform of Getor Jagatpura Station, [2] Provision of lifts in newly
constructed building no.4 (Magistrate office), building no. 5&6 (Electrical office),
building no.7 (Engineering office), building no.8 (C&W office) , Ganpati nagar ORH
and Loco colony (Electrification of lifts only), [3] Electrical work in connection with
provision for Extension of TMC siding along with facilities 08 Nos, [4] JP Div. -
Electrical work in c/w Provision of 03 Escalators (up & down) on each platform of
Phulera Station,[5] Asalpur Jobner Goods Shed (JOB) -Electrical work in connection
with Development of Goods Shed/Freight Terminal with all facilities, [6] One
running line with end side passenger platform at Alwar station, [7] Provision of
Electronic Interlocking (EI) in place of existing panel interlocking (PI) along with
interfacing with adjacent of ABS at BOBAS, [8] Strengthening of pre-cooling points,
boxes, battery charging boards terminals and other miscellaneous equipments at
washing line of JP and DPA. DKBJ & JP station over JP division, [9] JP Div. -Electrical
work in connection with Provision of Air Conditioners (AC) in Relay Rooms at 94
locations (Stations, OCs and ALHs) over Jaipur division
|
| Tender Detail : |
Electrical work in connection with [1] JP Div -Provision of 02 Escalators (up & down)
on each platform of Getor Jagatpura Station, [2] Provision of lifts in newly
constructed building no.4 (Magistrate office), building no. 5&6 (Electrical office),
building no.7 (Engineering office), building no.8 (C&W office) , Ganpati nagar ORH
and Loco colony (Electrification of lifts only), [3] Electrical work in connection with
provision for Extension of TMC siding along with facilities 08 Nos, [4] JP Div. -
Electrical work in c/w Provision of 03 Escalators (up & down) on each platform of
Phulera Station,[5] Asalpur Jobner Goods Shed (JOB) -Electrical work in connection
with Development of Goods Shed/Freight Terminal with all facilities, [6] One
running line with end side passenger platform at Alwar station, [7] Provision of
Electronic Interlocking (EI) in place of existing panel interlocking (PI) along with
interfacing with adjacent of ABS at BOBAS, [8] Strengthening of pre-cooling points,
boxes, battery charging boards terminals and other miscellaneous equipments at
washing line of JP and DPA. DKBJ & JP station over JP division, [9] JP Div. -Electrical
work in connection with Provision of Air Conditioners (AC) in Relay Rooms at 94
locations (Stations, OCs and ALHs) over Jaipur division |