Product Detail :
|
Execution of signaling & telecommunication work in connection with (1) bilaspur-durg - ttr (cs + cmsc) - 20 sets (1 in 12) & 11 sets (1 in 8.5) & ttr (ds) - 7 sets, (2) bilaspur- durg - through rail renewal (primary) 25.569 kms, (3) provision of 750- volt power supply for maintenance of hog coaches in washing/sick lines at coaching depot durg of raipur division, (4)raipur division - provision of 02 nos passenger lifts along with 06 meter wide fob at raipur railway station, (5) raipur division - rebuilding of bridge (478 mid km. 772/8-10 of span 3 x 12.2) between bilaspur-durg section for making the bridge fit to run 25t axle load, (6)raipur division provision of irs shelter at bia, drz, mxa and low cost pf shelter at shit & bsbh station, (7) provision of intercom exchange at wrs/raipur.
|